Called-in planning application
The Secretary of State for Communities and Local Government can ‘call in’ planning applications for his / her own consideration, taking over the process of determining the application from the local planning authority. However, as Parliament has given responsibility for day-to-day planning matters to local planning authorities, government policy is ‘…to be very selective about calling in planning applications’. (ref Written statement by the Parliamentary Under-Secretary of State for Communities and Local Government (Nick Boles) October 2012.
The ‘Plain English guide to the Planning System’ published by the Department for Communities and Local Government In January 2015 states that the Secretary of State for Communities and Local Government:
'... has the power to take over particular planning applications rather than letting the local planning authority decide, which is known as ‘call-in’. An application can be called-in whether or not there has been a request to do so. The Secretary of State uses these powers very sparingly, usually where planning issues of more than local importance are involved. If the Secretary of State decides to call-in a planning application, a planning inspector is appointed to carry out an inquiry into the proposal. The inspector will then report with their recommendation to the Secretary of State who will make a decision on the proposal, in much the same way as a recovered planning appeal.'
Each case is considered on its own merits, but generally, the sorts of planning application that the Secretary of State calls in are those that:
- Are considered nationally significant.
- Are in conflict with government policy.
- Have a significant long-term impact on economic growth.
- Have significant effects beyond their immediate locality.
- Are controversial.
- Raise significant architectural and urban design issues.
- Involve national security or foreign governments.
Where an application is called in, a planning inspector is appointed to hold an inquiry into the application and the Secretary of State must take the findings of the inquiry into account when they make their decision.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
[edit] External references
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.