Temporary services on construction sites
Before work can begin on a construction site, whether a big or small project, a number of services must be temporarily set up. This is in addition to the permanent services that will be required for the completed development and temporary site facilities that are required for the welfare of workers.
The development of temporary site services should be part of the site layout plans. These are prepared by contractors as part of their mobilisation activities before work on site commences. See Site layout plan for more information.
These services might include:
- A constant and reliable electricity supply. Fitness for purpose and safety must be ensured by fully testing and certifying electricity installations. Site offices and welfare units are likely to require a high concentration of electricity supply, but other, perhaps more isolated areas of a site may also need supplying.
- Water distribution and drainage. The CDM Regulations stipulate that sanitary conveniences, washing facilities and drinking water must be provided on a site.
- In order that construction work can continue effectively and safely in periods of insufficient natural light, it is important that a site is supplied with suitable artificial lighting. Lighting can be used internally for general movement and working on the site itself, externally for illuminating entry, storage and circulation areas, and can also be an effective form of deterrent for trespassers. Depending on the requirements of the site, an appropriate lighting plan should be drawn up. For more information, see Lighting of construction sites.
- If the site is big enough to require site offices, there will need to be an internet connection, WiFi, a local area network, telephones and so on.
- Perimeter security may include electric fences, buried cable detection systems, alarms, closed-loop systems, CCTV, microwave, infrared or radar sensors and so on.
It may be necessary to locate and connect to or divert existing services on the site.
It may be necessary to arrange for the supply of services with utilities companies.
[edit] Related articles on Designing Buildings
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.