Stop notice in planning
A stop notice is an enforcement notice that can be issued by a local planning authority if they believe there is a breach of planning control, that is, where development is carried out without the proper planning permission, or where there is a failure to comply with a condition or limitation stipulated on permitted development rights.
It is an order for the ‘relevant activity’ to cease on any part of that land to which the notice relates.
Section 183 of the Town and Country Planning Act 1990 enables the local planning authority to serve a stop notice either alongside the serving of an enforcement notice, or afterwards. If the compliance period specified in the enforcement notice has expired, and the relevant activity continues, then a stop notice can be issued.
A stop notice can be withdrawn at any time by giving notification to those who were served with the notice. (This does not prejudice the authority’s power to serve another stop notice.)
If more immediate action is required, the local authority can issue a temporary stop notice.
Failure to comply with a stop notice can lead to prosecution and an unlimited fine.
[edit] Related articles on Designing Buildings Wiki
- Enforcement notice.
- Local planning authority.
- Permitted development.
- Planning appeal.
- Planning enforcement.
- Planning enforcement officer
- Planning objection.
- Planning permission.
- Regularisation.
- Special Nature Conservation Order SNCO.
- Stop work order.
- Temporary stop notice.
- Town and Country Planning Act
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.