Scabbling in construction
Traditionally, the term ‘scabbling’ or ‘scappling’ referred to the use of axes or hammers to shape a stone. It now generally refers to the process of removing a thin layer from the surface of concrete or sometimes masonry.
This can be necessary in order to:
- Roughen surfaces to give better grip.
- Create decorative effects.
- Prepare surfaces for repairs, grouting, painting, sealing or coating.
- Remove adhesives, coatings, markings, laitence or surface contamination.
The term can also be used to refer to other process in which the surface of a material is removed, such as the removal of steel scale deposits and the removal of road markings.
Typically, scabbling is carried out with pneumatic devices that pound the surface with pointed rods. However, rotary devices that ‘flail’ the surface may also be used, and more recently, water Jet techniques using high-pressure water.
Scabbling concrete or other construction materials can produce high levels of silica-containing dust. Silica dust (known as Respirable Crystalline Silica (RCS)) can be inhaled and can lead to silicosis, a lung disease that causes permanent disablement and early death. As a consequence, the Health and Safety Executive (HSE) categorise scabbling as high risk. Effective control is necessary, involving assessment, prevention and controls such as on-tool extraction and Respiratory Protective Equipment (RPE).
For more information, see HSE Construction dust: Scabbling or grinding.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.