Lobby
A lobby is a space from which one or more other rooms or corridors can be accessed, typically found near the main entrance to a building. It may be used for access, circulation, or as a waiting area, and is derived from the latin ‘lobium’, meaning a covered walk, or portico. A lobby may be referred to as a vestibule, anteroom or foyer.
The word lobby can also be used specifically to refer to a large space adjacent to a legislative chamber where 'lobbying' may take place (that is, attempting to influence members of the legislature).
Approved Document M suggests that an entrance lobby may be used to:
- Limit air infiltration.
- Maintain comfort by controlling drafts.
- Increase security.
- Provide transitional lighting.
It should be designed to allow a wheelchair user (and companion), or a person pushing a pram to move clear of one set of doors before opening the other set. The minimum size therefore is related to the size of the door swing into the lobby.
It should be free from obstructions or distracting reflections, and should be provided with a cleaning mat if rainwater may be transported into the lobby.
Approved Document B refers to a protected lobby, which is a ‘…lobby which is adequately protected from fire in adjoining accommodation by fire-resisting construction’ and a firefighting lobby, which is ‘…a protected lobby providing access from a firefighting stair to the accommodation area and to the associated firefighting lift’.
Approved Document B refers to as a firefighting lobby as, '...a protected lobby providing access from a firefighting stair to the accommodation area and to any associated firefighting lift’.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.