Permit to work for construction
Permit to work (PTW) systems are formal procedures used to control activities that are considered high-risk. Permits only allow authorised personnel to perform those activities at specified times and in a way set out in the permit and referenced documents.
A permit to work might be required for activities such as:
- Electrical works.
- Hot works.
- Excavation.
- Lone working.
- Lifting operations.
- Work in confined spaces.
- Work to high risk spaces such as laboratories, or industrial plant.
- Work at height.
- Work to roofs.
- Temporary works.
- Work with asbestos.
- Demolition.
- Work to high pressure systems.
A permit to work system should:
- Only allow permits to be issued by authorised, competent personnel.
- Prevent high-risk work being carried out without a risk assessment having been undertaken.
- Consider whether any other work will impact on, or be impacted by, the permitted work.
- Ensure control measures and supervision are in place.
- Ensure method statements and emergency procedures are prepared.
- Ensure work is checked and returned to a safe state.
- Provide information to other parties that might be affected by the work.
- Include a system for handing back and cancelling permits.
Permits should:
- Describe the work and its location.
- Provide information about foreseeable risks.
- Provide information necessary for working safely.
- Set out requirements for personal protective equipment.
- Set out the time when the work can be carried out.
- Provide information about other permits.
Issuing permits to work can be a complicated and time-consuming process and so adequate notice should be given before a permit to work is required.
Permit to work systems do not in themselves make activities safer, this is only possible through the implementation of the correct procedures. It is important therefore that systems not box-ticking exercises, that they are explained at site inductions and that they are continuously monitored, reviewed and kept up to date.
NB BG 87/2024, Useful Information Guide, written by Chin Hang “Kay” Lam and published by BSRIA in 2024, defines a Permit-to-Work system as: ‘A documented management system that includes specific processes to record and authorise tasks to be carried out by designated parties, including employees and contractors, so that they are aware of their risks and responsibilities.’
[edit] Related articles on Designing Buildings
- Asbestos.
- CDM.
- Demolition.
- Gangmaster.
- Health and Safety.
- Method statement.
- Permit.
- Personal protective equipment
- Risk assessment.
- Safe2Torch.
- Site induction.
- Site records and registers.
[edit] External references
Featured articles and news
Biodiversity and the built environment digital series
The nature of building, with CIOB and CWP.
A call for prevention and sensitive re-use.
Risks to the long-term effectiveness of the BNG scheme
National Audit Office publish review of Biodiversity Net Gain.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Building Safety recommendations and Northern Ireland
The NI roadmap to improving safety in high rise residential.
BSA residential sector competence standards guidance
BSAS 01:2024 Organisational Capability Management System Standard - Competence Assurance.
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
No Falls Week. The importance of safe working at height
What to expect and what is on offer to avoid accidents.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.
From engineered product life-spans, to their extension.
Circular economy in the built environment
A brief description from 2021. Where are we now?
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.