Loft v attic
The terms 'loft' and 'attic' are often used interchangeably to describe a large void under, or partly under a roof, but above the main occupied spaces, that it is possible to access.
However, some definitions suggest that the term ‘attic’ refers to the entire storey of a building under the roof, whereas the term ‘loft’ refers to one or more rooms or spaces under the roof, but not the entire storey.
The difference between a loft room and an attic room is sometimes explained as:
- A loft room is accessed by a fixed staircase and has the whole loft area converted to a living space including the sloped eaves if the property has a pitched roof.
- An attic room is accessed by a fixed staircase and has the eaves area of the loft squared off to create a box room in the centre.
The term attic derives from the low decorative columns that often appear in the top storey of a building above the main façade in classical architecture. It was then adopted to refer to any decorative facade above the main story of a building, and subsequently, the space enclosed by such a facade.
The word 'loft' is thought to derive from Old Norse word 'lopt', meaning the upper chamber, upper region or sky, similar to the Old High German word 'luft', meaning air.
[edit] Related articles on Designing Buildings
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.