La Hospederia del Errante
La Hospedería del Errante (translation: ‘Guesthouse of Wandering’) is an experimental house in Ritoque, Chile. It was designed by architect Casanueva Carrasco and developed as part of the Open City field of architectural experimentation.
Construction began in 1981, creating a basic structure comprising masonry walls, partitions and glazed walls, as well as a floor deck of timber and zinc. The architectural elements were conceived of as 'autonomous', and capable of being dismantled and rearranged as required.
Work on the structure was halted in 1982 as the Chilean economy collapsed. Construction continued again from 1998-2000, with funding from the National Commission of Scientific and Technological Research.
The continuation of the construction work was intended to help explore two fields of research - luminosity and wind. It uses fuselages and lattices to examine the effects of wind and light energy on design and comfort.
The fuselages were conceived as technical elements capable of facing the fluid effects of wind and rain. The building faces south with planes curved to deflect the wind. The lattices were conceived as light control devices, with the interior designed as a place of residence, study and contemplation.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.