Gallery definition
Approved document B, Fire Safety, Volume 2, Buildings other than dwellinghouses (2019 edition), defines a ‘gallery’ as: 'A floor or balcony that does not extend across the full extent of a building’s footprint and is open to the floor below.'
The previous edition of Approved document B defined a gallery as: ‘A raised area or platform around the sides or at the back of a room which provides extra space.’
The Scottish Building Standards, Part I. Technical Handbook – Domestic, Appendix A Defined Terms, suggests that gallery means:
‘…a raised floor or platform, including a raised storage floor, which is open to the room or space into which it projects and which:
- has every part of its upper surface not less than 1.8 metres above the surface of the main floor of the said room or space and
- occupies (or, in the case of there being more than one gallery, together occupy), not more than one-half of the floor area of the said room or space.
The word gallery can also refer to a room or building for the display or sale of works of art, such as the National Gallery.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
Comments