Fire risk
PAS 9980:2022, Fire risk appraisal of external wall construction and cladding of existing blocks of flats – Code of practice, published by BSI Standards Limited in 2022, defines fire risk as the: ‘combination of the likelihood of the occurrence of fire and likely consequence(s) of a fire. NOTE In the context of this PAS, the relevant consequences of a fire are those involving injury to people (number and severity of injuries), as opposed to damage to property.’
Articles on Designing Buildings about fire risk include:
- Designing out fire risk in roof voids.
- Fire risk assessment.
- Fire risk assessments and historic buildings.
- Fire Risk Assessor.
- Fire risk in high-rise and super high-rise buildings DG 533.
- Managing fire risk in commercial buildings: A guide for facilities managers.
- Place of special fire risk.
- Risk assessment under The Regulatory Reform (Fire Safety) Order 2005.
- The need for company fire risk assessments.
Featured articles and news
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.