Builder's work in connection
The term ‘builder’s work in connection’ (BWIC) refers to builder's work that is necessary as a result of other works, typically mechanical and electrical services but also specialist installations, such as lifts, escalators, roller shutters, hoists and cleaning cradles, and so on.
For example, the installation of mechanical and electrical services might require:
- Cutting, forming or drilling through walls, floors or ceilings to allow services to pass.
- Ensuring structural integrity is not compromised.
- Chasing block and brickwork for conduits or pipes.
- Lifting and replacing floors.
- Asbestos removal.
- Plant moving services.
- Sealing holes.
- Reinstating fire, thermal or acoustic separation.
- Constructing plinths.
- Making good plaster and other finishes.
- Maintenance access requirements such as access panels, decking, platforms, cat ladders and handrails.
This may involve works that require building regulations approvals and possibly testing certificates (for example, cleaning cradle restraining bolts).
Builder's work in connection is generally carried out by the main contractor for a mechanical and electrical sub-contractor and other such specialist trades. However, sometimes, the mechanical and electrical works might be part of the main contract and the builders work in connection sub-contracted.
Builder’s work in connection should not be confused general site preliminaries such as; welfare provisions, site offices, plant, site waste clearance, and so on, which are priced separately.
Estimators typically price builder's work in connection as 7% of the specialist work value.
[edit] Related articles on Designing Buildings
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.