Bribery in construction
Bribery is a form of corruption and is seen as being more prevalent in construction and engineering than any other sector [1]. It is more likely to occur during the tendering and procurement stages of contracts although it can occur at any stage. This is mainly because on large contracts, individuals within organisations can influence or even decide on the procurement of goods. This provides the opportunity for corruption, compounded by a lack of transparency and governance and inaccurate recording in financial statements.
An example would be a payment by a supplier ‘A’ to a client employee in order to influence a purchase decision in favour of A’s product. A further example would be a subcontractor bribing an employee of the main contractor to gain their favour over a rival subcontractor. Bribery can ultimately affect the quality of the final construction – if an inferior product is used as a result of bribery, an inferior construction will almost certainly result.
The nature of building can make bribery easy to conceal. For instance, bribes might be made to ensure the inclusion of cheap, sub-standard materials on a building project. The money saved may be paid as a further bribe to ensure that the checkers sign-off the finished construction. This can then be difficult to discover, as works on construction projects are often covered up by other materials or embedded deep in hard to inspect places.
Bribes can be paid directly. But they are more likely to be paid through third-parties and intermediaries, something that is more prone to occur when companies move into new markets and place more of their operations with third parties, especially overseas.
The scope for bribery is greater on large, international projects due to:
- The scale involved.
- The complexity of projects allowing concealment of illegal activities.
- The myriad contractual links and supply chains involved.
- The reliance on local agents abroad.
- The acceptance of bribery in some cultures.
- The involvement of corrupt officials.
Many large companies, mindful of complying with the UK Bribery Act 2010, forbid or place strict restrictions on their employees receiving gifts from suppliers that may be construed as bribes. This includes lavish lunches and other forms of ‘entertainment'.
Notes
- PwC’s Global Economic Crime Survey found that 49% of all respondents experienced bribery and corruption, compared to the 27% of the overall sample covering other industries. 64% of engineering and construction executives saw bribery and corruption as the highest risk of operating globally. 29% said they were asked to pay a bribe while 38% said they lost an opportunity to a competitor who they suspect paid a bribe. Ref Fighting corruption and bribery in the construction industry. PwC 2014 Global Economic Crime Survey.
- Functional Standards Common Glossary, published by the Cabinet Office, defines bribery as: ‘The offering, promising or giving of a financial or other advantage to induce or reward improper performance and/or the request, or receipt of such an advantage. It includes the corporate offence of failing to prevent bribery (as set out in the Bribery Act 2010).’
[edit] Related articles on Designing Buildings
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.