Tomorrow's challenges in today's buildings terms and conditions
Click here to return to the competition details.
- The judges’ decision is final and not subject to appeal. No correspondence will be entered into.
- Designing Buildings Ltd (DBL) reserves the right to present no prize if an insufficient number of deserving entries is received.
- DBL reserves the right, at its sole and absolute discretion, to use names, entry details and information about participants without obtaining further consent from the participant or providing any payment whatsoever to the participant for any commercial or non-commercial endeavours, publicity, advertising, trade or promotion in perpetuity.
- DBL reserves the right to modify the format and content of entries for publication purposes.
- DBL will not be responsible or liable for any problem, loss or damage of whatsoever nature suffered by any party due to any delay and/or failure in submitting entries to the competition.
- DBL will not be responsible or liable for any costs, problems, damage or loss of whatsoever nature to the participants resulting from their participation in the competition.
- DBL reserves the right to disqualify any participant that it determines is directly or indirectly tampering with the entry process or the operation of the competition and/or to be acting in breach or potential breach of these terms and conditions.
- Entries may reference (and hyperlink) other sources, but must not plagiarise them. Quotes and references must be clearly marked. Any form of plagiarism may result in disqualification. It is the responsibility of the participant to ensure that their entry does not infringe the copyright of any third party (including the use of images) or any other laws.
- Entries may only be submitted online following the instructions provided.
- Late entries will not be considered by the judges as part of this competition.
- DBL is responsible for administering this competition. BSRIA is responsible for awarding the prize.
- All enquiries should be directed to DBL at [email protected]. BSRIA will not enter into any correspondence.
- Entries should be submitted in English.
- Entry to the competition is deemed an acceptance of DBL’s general terms and conditions of use.
Featured articles and news
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.
New Homes in New Ways at the Building Centre
Accelerating the supply of new homes with MMC.
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.