Procurement team for design and construction
Procurement is the purchasing process for goods and services. On a construction project, procurement may be used to purchase design services, construction works, goods, materials and so on.
The team that carry out this process (or part of it) may be described as a procurement team. Their functions are typically conducted via a tendering process and may involve; defining procurement packages, preparing tender documents, identifying suitable suppliers, assessing tender submissions, negotiating and agreeing terms and so on.
They will typically work for contractor or developer, and ensure the design and construction of a building is procured according to a strategy that meets both their own commercial needs and the objectives of the client. Typical considerations are likely to include speed, cost, quality, specific project constraints, risk, ownership, financing, insurance and warranties, track record, market conditions and so on.
A procurement team (which my range from a single individual to a whole department) is usually necessary as projects are complex, with many suppliers and defined timescales, and contractors may be inundated with offers from suppliers. It is the job of the procurement team to manage suppliers and develop purchasing strategies that meet the requirements of the project.
The procurement manager who may lead the procurement team will usually be responsible for developing a clear procurement strategy for the purchase of goods and services. They may be part of a wider finance team and will typically be a qualified, mid- to senior-level management individual.
The members of a procurement team will usually be professionals who are experienced in providing essential services and skills related to the purchase of materials and supplies for the building project. They may have relevant educational qualifications in business, purchasing, quantity surveying, construction management and so on, but usually, there are no specific requirements to have procurement-related qualifications. Some procurement managers and team members may simply have long and valued experience in the area. However, qualifications options are available, for example through the Chartered Institute of Procurement and Supply (CIPS).
The individuals working for a procurement manager may be organised so that each is responsible for procuring certain aspects of a construction contract e.g materials for substructure, superstructure, fit-out etc.
[edit] Related articles on Designing Buildings Wiki
- Admeasurement
- Automated vendor selection.
- Construction contract
- Construction manager
- Design and build procurement route
- Design build finance and operate
- Engineering procurement and construction contract
- Fast track construction
- Framework contract
- Guaranteed maximum price for construction contracts
- Lump sum contract
- Management contractor
- Managing the procurement process
- OJEU procurement procedures
- Private finance initiative
- Procurement plan.
- Procurement route options pros and cons
- Public private partnerships PPP
- Public procurement
- Single-stage tender
- Tender processes for construction contracts
- Traditional contract for construction
- Two-stage tender
- Typical tender process for construction projects.
[edit] External references
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.