Loyly, Finland
Designed by Avanto Architects, Löyly is a coastal sauna located in Hernesaari, a former industrial area of Helsinki, Finland. It was completed in 2016.
The building is characterised by an irregularly-shaped outer shell that acts as a ‘cloak’, covering the rectangular black box that contains the sauna and restaurant.
Wooden slats and bleachers create the multi-faceted volume of the sauna, allowing visitors to climb up to a viewing platform. The building is relatively low to the ground so that it will not impinge upon sea views for future residents. At ground level, a terrace extends out over the coastline, with a flight of stairs leading down into the sea.
The building is made of blackened concrete and steel and pale Scandinavian birch wood, materials selected for their durability. The external pine cladding was pressed, glued and heat-treated, and is intended to grey with age so that it blends in with the stony coastline.
The developers intend to rediscover the community attachment to public saunas, which have been under threat from the growing popularity of private saunas. Finland, with a population of 5.4 million, has over three million saunas, roughly one per household.
[edit] Related articles on Designing Buildings Wiki
- Blur Building.
- Building of the week series.
- Chapel of the Holy Cross, Sedona.
- Cube Houses.
- Dancing House, Prague.
- Fish Building, India.
- Gentle Genius.
- Liepaja Thermal Bath.
- Little Crooked House, Poland.
- Norwegian Mountaineering Center.
- Suvela Chapel.
- Swimming pool construction.
- Underwater restaurant.
- Unusual building design of the week.
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.