Insights into Northern Powerhouse Rail
ICE’s insights paper introduces Northern Powerhouse Rail and examines the potential impacts of the programme.
Contents |
[edit] Introduction
Northern Powerhouse Rail has been positioned as a solution to the Government’s ambition to ‘level up the North’. But while Northern Powerhouse Rail is widely discussed, for many it is unclear what it would actually entail.
Rather than a single project, Northern Powerhouse Rail is a major rail programme designed to unlock the economic potential of the North. The programme defines a proposed rail network for the North of England that improves connectivity between major economic centres and transport hubs throughout the North East, North West and Yorkshire. It consists of six routes between major cities:
- Liverpool to Manchester.
- Manchester to Sheffield.
- Manchester to Leeds.
- Leeds to Newcastle.
- Leeds to Hull.
- Sheffield to Hull.
Northern Powerhouse Rail proposals feature new, significantly upgraded and electrified rail lines to increase the capacity, speed and resilience of the North’s rail network.
[edit] Integrating HS2 and Northern Powerhouse Rail
For Transport for the North, the proponent of programme, both Northern Powerhouse Rail and HS2 are integral to a future Northern rail network and should be planned as a programme of works. With the Government’s decision to proceed with HS2 in full, this ambition has become more likely. The Government has committed to plan the two initiatives in an integrated manner as part of High Speed North.
ICE has previously published an insights paper outlining the potential benefits of HS2, delivery challenges and the alternative approaches to delivering improvements to the UK’s railways.
[edit] Enhancing rail connectivity and capacity in the North
According to Transport for the North, Northern Powerhouse Rail has the potential to significantly improve journey times between major centres. For example, the journey time between Manchester and Leeds could be cut from 46 minutes to 25 minutes, whilst Leeds to Newcastle could go from 88 minutes to 58 minutes.
By 2050, Northern Powerhouse Rail could bring more than 10 million people within 90 minutes of key cities in the North, against just 2million today. The programme could also increase the number of seats between key Northern cities by up to 35,000 per hour. This could help to address crowding, punctuality and reliability issues on rail across the North, ensuring future growth in demand could be met sustainably.
[edit] Boosting economic growth and productivity
So, what are the economic benefits of improved rail capacity and connectivity in the north? Well according to Transport for the North, a primary objective for Northern Powerhouse Rail is to boost business growth and close the north-south gap in productivity.
According to their analysis, the rail programme could support an increase in productivity of up to 2% by better connecting the North and result in Gross Value Added benefits of up to £3.4 billion per year. Through expanded labour markets, improved business to business connectivity, and greater access to ports and airports, Northern Powerhouse Rail could facilitate transformational economic growth.
The full insights paper is available at: https://www.ice.org.uk/news-and-insight/policy/insights-into-northern-powerhouse-rail
This article was originally published on the ICE Website on 17 March 2020. It was written by Alex Hardy, ICE Policy Manager.
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
- Beeching cuts.
- Cities Devolution Bill.
- Crossrail 2.
- Devolution.
- HS2
- HS2 and community projects.
- HS2 decision.
- HS2 Phase One - safeguarding directions updated.
- ICE articles.
- Northern Powerhouse discussion.
- Northern Powerhouse transport blueprint.
- The Institution of Civil Engineers.
- The need for an integrated railway in the Midlands and North.
- What does the Northern Powerhouse mean for us?
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February