Blocked concrete delivery pumps
Contents |
[edit] Introduction
Concrete delivery pumps frequently experience blocked pipes.This can occur for a number of reasons.
[edit] Why blockages happen
One of the main causes of a blockage is that there is something wrong with the material. This primarily happens for three reasons related to segregation of concrete, particle size of the aggregate (particularly if it is too large) or lack of controlled delivery of materials.
Blockages can also happen if something wrong with the concrete delivery pump. This typically happens for one of two reasons: leakage of the delivery pipe or incomplete cleaning of the pipes.
Another reason for blockages can be associated with the management of materials through the concrete delivery pump; this can include speed (too fast), scheduling (intermittent delivery is poorly scheduled) or temperature (and its effect on the materials).
[edit] Prevent blockages
There are three actions that can be taken to help prevent blockages:
- Carefully select materials of the suitable size.
- Strictly control oversight of concrete delivery pump operations.
- Carefully manage the distribution of materials once pumping has begun.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.