Target fabric energy efficiency rate
Dwelling Fabric Energy Efficiency rates (DFEE) and Target Fabric Energy Efficiency rates (TFEE) were introduced by the 2013 edition of approved document L1A of the building regulations, 'Conservation of fuel and power in new dwellings', which came into force on 6 April 2014. The energy performance requirements of the 2013 edition have been strengthened to deliver a 6% carbon dioxide saving across the new homes build mix relative to the 2010 edition.
Dwelling Fabric Energy Efficiency rates and Target Fabric Energy Efficiency rates sit alongside the requirements for Target CO2 Emission Rates (TER) and Dwelling CO2 Emission Rates which were already part of the 2010 edition of the approved document.
The Target Fabric Energy Efficiency rate is the minimum energy performance requirement for a new dwelling approved by the Secretary of State in accordance with regulation 25 of the building regulations. It is expresses as the amount of energy demand in units of kilowatt-hours per square metre of floor area per year (kWh/(m^2.year).
The TFEE is derived from a notional dwelling of the same size and shape as the actual dwelling being constructed. A summary of the Part L 2013 notional dwelling is published in Table 4 of approved document L1A and the full detail is set out in the Standard Assessment Procedure (SAP 2012) Appendix R. However, following responses to the consultation on the 2013 changes, a further 15% is permitted to allow some design flexibility.
The Dwelling Fabric Energy Efficiency rate is the actual energy performance of the new dwelling.
In accordance with regulation 26A of the building regulations, the calculated Dwelling Fabric Energy Efficiency rate must not be greater than the Target Fabric Energy Efficiency rate.
If the actual dwelling is constructed entirely to the notional dwelling specifications it will meet the fabric energy efficiency targets, however, the notional dwelling is not prescriptive and developers are free to vary the specification, provided that TFEE rate is achieved or bettered.
Before work starts, the builder must calculate the DFEE rate of the dwelling as designed, to demonstrate it is not greater than the TFEE rate. The builder must give this design-based calculation to the Building Control Body (BCB) along with a list of specifications used.
When work is complete, the builder must notify the BCB of the DFEE rate and TFEE rate, and whether the building was constructed in accordance with the list of specifications submitted to the BCB before work started. A list of any changes to the design-stage list of specifications must be given to the BCB.
For a building that contains more than one dwelling (such as a terrace of houses or an apartment block), average rates can be used. An average cannot be calculated across separate multiple buildings on a site.
To guard against poor performance of individual elements, limiting fabric values are retained in Table 2 of approved document L1A and limiting building services efficiencies are set out in the Domestic Building Services Compliance Guide.
[edit] Related articles on Designing Buildings Wiki
- 2013 changes to the approved documents for part L of the building regulations.
- Approved document L.
- Approved documents.
- Building control body.
- Building Regulations.
- Dwelling emission rate.
- Fabric Energy Efficiency Standard FEES.
- Limiting fabric parameters.
- Standard assessment procedure.
- Target emission rate.
[edit] External references
This article contains public sector information licensed under the Open Government Licence v2.0 ref:
- Approved Document L1A, Conservation of fuel and power in new dwellings, 2013.
- DCLG circular New and amended Approved Documents and new Building Services Compliance Guides to support the energy efficiency requirements of the Building Regulations. 3 December 2013.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February