Centro Eventi Multifunzionale, Italy
The Centro Eventi Multifunzionale (CEM) has been completed in May 2016 by Bargone Architetti Associati on the shoreline of Lake Maggiore, Italy.
The multifunctional arts centre is made up of four big structures with curved shapes inspired by lake stones and linked by a prismatic volume. These pebble-shaped structures contain two theatres, a rehearsal space, restaurant, cafe and office space.
Zinc metal sheets with a dramatic shading and vibrant colour clad the four curved volumes, with the colour recalling and harmonising with the Verbania lake and skies. A local stone is used for the external pavings. Inside, timber which is warm welcoming and natural is the main element.
The external landscape is sculptured with a system of descending bleachers (raised, tiered rows of benches) allowing a breathtaking panoramic view of the lake and the surrounding Italian Alps.
Content and images courtesy of Bargone Architetti Associati.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.