Concrete delivery pumps frequently experience blocked pipes.This can occur for a number of reasons.
[edit] Why blockages happen
One of the main causes of a blockage is that there is something wrong with the material. This primarily happens for three reasons related to segregation of concrete, particle size of the aggregate (particularly if it is too large) or lack of controlled delivery of materials.
Blockages can also happen if something wrong with the concrete delivery pump. This typically happens for one of two reasons: leakage of the delivery pipe or incomplete cleaning of the pipes.
Another reason for blockages can be associated with the management of materials through the concrete delivery pump; this can include speed (too fast), scheduling (intermittent delivery is poorly scheduled) or temperature (and its effect on the materials).
[edit] Prevent blockages
There are three actions that can be taken to help prevent blockages:
- Carefully select materials of the suitable size.
- Strictly control oversight of concrete delivery pump operations.
- Carefully manage the distribution of materials once pumping has begun.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.