Avanti
This is an archive version of an article from the CPIc website, which was closed in 2025. CPIc (the Construction Project Information Committee) was formed from representatives of the major industry institutions and was responsible for providing best practice guidance on the content, form and preparation of construction production information. |
[edit] AVANTI: ICT enabled collaborative working – sharing what we know and making it work
The AVANTI programme was one of the two ‘programmes’ of activity selected for funding by DTI in 2002. The introduction of larger areas of development – aiming to become self-funding, ongoing networks – was a response to the recommendations made by Sir John Fairclough in Rethinking Construction Research and Innovation (see Chapter 1).
The Avanti initiative was led by Collaborating for the Built Environment (Be) in partnership with Teamwork and IAI. The group identified a need to reduce the risks involved in adoption of new methods of working, bringing together areas of current best-practice (such as CPIC protocols) that had previously gained too little market penetration to have significant impact on the sector.
The objective was to deliver improved project and business performance through the use of ICT to support collaborative working, applying the AVANTI approach by getting people to work together; providing processes to enable collaboration; and applying tools to support collaborative working.
The Avanti approach increases the quality of information, the predictability of outcomes and by reducing risk and waste. Avanti is not an IT system or tool. As a method or approach, Avanti can be applied to projects using 2D CAD as well as those using 3D intelligent modelling or building information models. It is supported by handbooks, toolkits and on-site mentoring.
The core of the Avanti method is an approach where all CAD information is generated with the same origin, orientation and scale, and organised in layers that can be shared. All layers and CAD model files are named consistently within a specific Avanti convention to allow others to find the relevant CAD data.
Avanti achieves its core objective in three ways; through providing consultants, each an expert in the Avanti approach; Information standards and procedures; and cross-project assessment and measurement.
Evaluation of the impacts of the Avanti have shown:
- Early commitment offering up to 80% saving on implementation cost on medium size project
- 50-85% saving on effort spent receiving information and formatting for reuse
- 60-80% saving on effort spent finding information and documents
- 75–80% saving in effort to achieve design co-ordination
- 50% saving on time spent to assess tenders and award sub-contracts
- 50% saving on effort in sub-contractor design approval
[edit] Avanti Report from DTi Project Showcase
In February 2007, the Dti published The Construction Research Programme – Project Showcase which included a report on the CWC Avanti project.
The Construction Research Programme – Project Showcase
[edit] Avanti Case Studies and Presentations
- Case Study 1: The team behind Avanti helps Taylor Woodrow to achieve co-ordinated design and delivery on a major PFI project at St Helens and Knowsley Hospitals
- Case Study 2: The Avanti team works with Costain at PalaceXchange to deliver a better product with less waste in the design process
- The Avanti Approach presentation from Constructing Excellence
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.