Code of Practice for the Provision of Premises Information Boxes in Residential Buildings, Version 1, published in December 2020 by the Fire Industry Association (FIA) and the National Fire Chiefs Council (NFCC), defines stay put as: ‘An evacuation strategy based on the principle that only the residents of the flat of fire origin need to escape initially, while other residents may remain in their own flats.’
PAS 9980:2022, Fire risk appraisal of external wall construction and cladding of existing blocks of flats – Code of practice, published by BSI Standards Limited in 2022, defines a stay put strategy as a:
Strategy normally adopted in blocks of flats and maisonettes whereby, when a fire occurs in a flat or maisonette, the occupants of that dwelling evacuate, but occupants of all other dwellings can safely remain in their dwellings unless directly affected by heat and smoke or otherwise directed to leave by the fire and rescue service.
NOTE 1 In a building with a stay put strategy, residents can leave their flats at any time if they wish and are able to do so (e.g. if they feel unsafe), but to do so might, under some circumstances, place them at greater risk than remaining within their flats.
NOTE 2 “Stay put” is sometimes referred to as “defend in place” or “stay safe”.
[edit] Related articles on Designing Buildings
- Approved document B.
- Building Safety Act.
- Cladding.
- Competent person.
- Fire alarm.
- Fire and rescue service.
- Fire Safety Act.
- Fire Safety Order.
- Fire safety strategy.
- Fire.
- Grenfell Tower.
- Joint fire code.
[edit] Related articles on Designing Buildings
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.