Grenfell tower articles
Articles about the Grenfell Tower fire are written by our editors and updated regularly. Scroll to the bottom of the articles for the latest developments:
- The overall story.
- Hackitt review of the building regulations and fire safety, final report.
- Public Inquiry.
Other related articles include:
- 2022 changes to fire safety guidance and building regulations.
- ACM cladding.
- ACM cladding testing by BRE.
- Addressing building failures: Grenfell Tower and Edinburgh schools.
- Advice for External Wall Insulation (EWI) systems with a render or brick-slip finish.
- Advice note for external wall systems that do not incorporate ACM.
- BS 8414 Fire performance of external cladding systems.
- BS 9999: Code of practice for fire safety in the design, management and use of buildings.
- BS 9991:2015 Fire safety in the design, management and use of residential buildings. Code of practice.
- Building a safer future: an implementation plan.
- Building a safer future: proposals for reform of the building safety regulatory system.
- Building safety agreement with developers.
- Building Safety Act.
- Building Safety Bill.
- Building Safety Charter.
- Building Safety Fund.
- Building safety in Wales.
- Building Safety Regulator.
- Celotex insulation.
- Chief inspector of buildings.
- CIAT response to Grenfell inquiry.
- Code for Construction Product Information CCPI.
- Competence Steering Group.
- Consultation on banning the use of combustible materials in the external walls of high-rise residential buildings.
- Diploma in Building Safety Management.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire Safety Bill.
- Government consults on second staircases in new residential buildings over 30m.
- Government response to the Building a Safer Future consultation.
- Grenfell and professional indemnity insurance.
- Grenfell Tower fire.
- Grenfell Tower independent expert advisory panel.
- Grenfell Tower industry response group.
- Grenfell Tower Inquiry.
- Grenfell Tower Inquiry Phase 1 Report.
- CIAT Grenfell Tower working group.
- HPL cladding.
- ACA response to Hackitt report on Grenfell Tower.
- ICE Grenfell Tower review.
- Joint Competent Authority.
- Independent review of the building regulations and fire safety.
- Independent review of the construction products testing regime.
- Lakanal House fire.
- Non-ACM cladding.
- Post-Grenfell product code combats misleading marketing.
- Private v social housing following the Grenfell Tower fire.
- Procurement after Grenfell.
- Protecting tenants and leaseholders from unsafe cladding.
- Rainscreen cladding.
- Raising the bar.
- Reform of building safety standards.
- Residential Property Developer Tax.
- Ronan Point.
- Setting the bar.
- Systems approach.
- The Cube.
- The Regulatory Reform (Fire Safety) Order 2005.
- Torre Windsor office building fire.
- Grenfell fire door investigation.
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.