Firefighting lift
Buildings other than low-rise buildings without a deep basement, require additional facilities to enable the fire and rescue service to avoid delay, reach fires, work near fires, and to provide a secure operating base. This includes the provision of; firefighting lifts, firefighting stairs and firefighting lobbies, combined in a protected shaft described as a ‘firefighting shaft’ (although not all firefighting shafts need to include firefighting lifts).
The very basic requirements for firefighting shafts are illustrated below. Blocks of flats are treated differently from other buildings because of their high degree of compartmentation.
Approved Document B - Fire Safety: Volume 2 - Buildings other than dwellinghouses, defines a firefighting lift as, ‘A lift with additional protection and with controls that enable it to be used by the fire and rescue service when fighting a fire.'
A firefighting lift includes; the lift car, the lift well, the lift machinery space, the lift control system and the lift communications system. Firefighting lifts have very specific safety requirements and the presence of firefighting controls within a lift does not necessarily mean that it is a firefighting lift. Firefighting lifts should comply with the requirements of BS EN 81-72:2015 and BS EN 81-1:1998 or BS EN 81-2:1998.
Replacing EN 81-1 and 81-2, EN 81-50 provides the framework for design and testing of elevator components. The standard is binding as of 1 September 2017 for all new elevators.
NB an evacuation lift is a lift that may be used for the evacuation of people in a fire. It is generally not appropriate to use lifts if there is a fire because of the danger that they will become immobilised. However, in some circumstances lifts may be provided as part of a management plan for evacuation, although they will then need to be appropriately sited and protected and may need to contain a number of additional safety features. Where a firefighting lift provides access and facilities for the fire service, this can be used as part of a management plan for evacuating disabled people. However, any such plan should include contingency provisions for when the fire and rescue service arrive.
See also:
[edit] Related articles on Designing Buildings
- Approved documents.
- Escalator.
- Fire and rescue service.
- Fire compartmentation.
- Fire resistance.
- Firefighters' lift.
- Firefighting lobby.
- Firefighting route.
- Firefighting shaft.
- Fireman's lift
- Lifting platform.
- Lifts.
- Lifts and Escalators: A Quality Perspective.
- Lifts and Their Special Operating Modes.
- Means of escape.
- The importance of service lifts.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.