CIC Guidance on working with New Engineering Contracts
CIC have written a new Risk Management Briefing entitled "Consulting in an NEC environment".
NEC contracts cater for the client/contractor and client/consultant relationship.
The Risk Management Briefings are a series of free guidance documents produced by the CIC Liability Panel. The briefings examine current areas of concern in relation to liability.
This briefing refers specifically to NEC4, Professional Services Contract (PSC) and its importance to the intended £650 billion spend on public and private infrastructure projects announced by the UK government in 2021.
The Liability Panel was set up to consider liability, legal and insurance issues. The panel drafts and publishes standard form contract documentation for consultants as well as the freely available briefings.
Nasir Khan, Chair of the Liability Panel said: "The UK government announced in 2021 that it has chosen the NEC4 contracts as one of the three options to deliver its £650 billion spend over the next 10 years. The CIC Liability Panel’s risk management briefing on Consulting in an NEC Environment provides consultants some key points to watch out for. The NEC contracts are known for their collaborative and flexible approach to project management. However, the consultants need to be mindful of the Scope, Z Clauses, Programme, and their obligations to mitigate potential liability risks.”
A full suite of CIC Risk Management Briefings can be downloaded for free from the CIC website.
This article appears on the CIAT news and blogsite as "Guidance on working with New Engineering Contracts" dated January 9, 2023.
--CIAT
[edit] Related articles on Designing Buildings
- As Low As Reasonably Practicable (ALARP).
- CMA and IRM publish 2020 competition law risk guide.
- Code of practice for project management.
- Design risk management.
- Facility security risk management plan.
- Interface risk in construction.
- NEC contract change management systems.
- NEC contracts - road development and management schemes.
- NEC contracts and collaborative working.
- NEC early contractor involvement.
- NEC early warning notices - a tool of mutual benefit.
- NEC3.
- NEC4.
- NEC Option A: Priced contract with activity schedule.
- NEC Option B: Priced contract with bill of quantities.
- NEC Option C: Target contract with activity schedule.
- NEC Option D: Target contract with bill of quantities.
- NEC Option E: Cost reimbursable contract.
- New Engineering Contract.
- Project manager.
- Project risk.
- Reflections on 2021.
- Resource allocation in design and construction.
- Risk appetite.
- Risk assessment.
- Risk assessment: a quality perspective.
- Risk feedback.
- Risk management.
- Risk mapping.
- The NEC and the Z clause.
- Third party dependencies.
- Time Risk Allowance.
- What is a hazard?
- Z clauses.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.