Glass blowing
Stained Glass Windows: Managing Environmental Deterioration, published by Historic England in 2020, suggests that glass blowing is a: ‘Glass-forming technique, probably developed in Babylonia and the Middle East by the 1st century BC. Molten glass is gathered into a ball on the end of a hollow pipe, and rolled on an iron former to roughly shape it and to slightly cool the surface. Then the pipe is used to blow air into the glass and form it into a bubble. By repeated blowing, shaping and reheating, the glass can be formed in many ways.’
Archaeological Evidence for Glassworking, Guidelines for Recovering, Analysing and Interpreting Evidence, published by Historic England in 2018, defines a blowing iron as: ‘A long iron tube that was dipped into the molten glass to collect a gather for subsequent inflating and shaping.’
It defines optic blowing as a process in which: 'A gather of glass is blown into a mould with a pattern on the inner surface, which transfers to the glass. Continued free blowing results in movement and distortion of the pattern.'
And overblow as: 'A by-product of mould blowing, referring to the glass that remains outside the mould, which is removed and recycled.'
It defines paraison as: 'The partially inflated gather of glass at the end of the blowing iron.'
And paraison end as: 'A marble-shaped blob of glass pinched from the end of the gather during the blowing of particular forms, such as the bowls of goblets.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.