Approved document S Infrastructure for the charging of electric vehicles
Approved Document S: infrastructure for charging electric vehicles, was published by the Department for Levelling Up, Housing and Communities on 15 December 2021. It provides technical guidance regarding the installation of charge points required by Part S of the Building Regulations.
Part S of the Building Regulations requires that certain buildings with associated parking must have access to electric vehicle charge points.
Very broadly, for new residential developments, a charge point is required for each parking space, with some exceptions. Where no associated parking spaces are provided, there is no requirement to instal a charge point.For non-residential developments with more than 10 parking spaces, one space must have access to a charge point, and cable routes must be provided to 20% of the other spaces. The charge points need to provide a minimum of 7kW to an untethered charger.
It sets an average cost cap of £3,600 for all work involved in installing a charge point. If the cost exceeds this, only the cable routes themselves need to be installed. Where the cost of is more than 7% of the total cost of a major renovation, there is no requirement to instal either electric vehicle charge points, or the cable routes if the cost of the cable routes is more than 7%.
Approved Document S applies to:
- New residential and non-residential buildings.
- Buildings undergoing a material change of use to dwellings.
- Residential and non-residential buildings undergoing major renovation.
- Mixed-use buildings that are either new, or undergoing major renovation.
Approved Document S came into effect on 15 June 2022, but does not apply to works where an initial notice was registered before 15 June 2022, provided the work starts before 15 June 2023.
[edit] Related articles on Designing Buildings
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.