Accident reports in construction
There is a legal requirement through the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 (RIDDOR) for accidents and incidents to be reported to the Health and Safety Executive (HSE).
While RIDDOR recommends that all accidents, however small, are recorded in an accident book, it identifies the more serious types of accidents which must be reported to HSE as well as being recorded in the book. These include:
- Any injury that stops an employee doing their normal work for a period of 3 days or more.
- Major injuries such as broken arms, ribs, legs, etc.
- Fatalities.
- Disease.
- Dangerous instances occurring at work such as machinery breaking, scaffolding collapsing or any other appliances breaking and causing damage.
Forme can be found here for the following incidents:
- Injury.
- Dangerous occurrence.
- Injury offshore.
- Dangerous occurrence offshore.
- Case of disease.
- Flammable gas incident.
- Dangerous gas fitting.
The appropriate form should be completed by the responsible person. Fatalities and major injuries can be reported by phone to the HSE. A report must be received within 10 days of the incident.
The following information should be recorded:
- Injured person’s personal and contact details (name, phone number, address, age, occupation, etc.).
- Reporter’s personal and contact details (name, position, phone number, address, etc.).
- Accident details (date, time, location).
- Injury details (type, body part, whether any work days were lost as a result, whether an ambulance was required, whether the injured person lost consciousness, etc.).
- Witness details (name, phone number, address, etc.).
- Details of any supporting evidence (e.g. CCTV footage, photographs, training records, health and safety check records, cleaning logs, etc.).
- Reasons for accident (how it occurred, working conditions at the time, PPE being worn, equipment being used, events leading up to accident, etc.).
- Response to accident (first aid provided, whether the area was made safe, direct action).
- Preventative action (training needs, preventative plan put in place, how recurrences will be prevented).
[edit] Related articles on Designing Buildings
- Accident book.
- Construction health risks.
- Health and safety file.
- Injuries on construction sites.
- Near miss.
- Notification to HSE.
- Occupational accident.
- Occupational injury.
- Reporting accidents and injuries on construction sites RIDDOR.
- Safety audit.
- Site records and registers.
- Slip and trip hazards.
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.