Why has there not been any discussion on the relevancy of the compliance requirements for manufacturers/importers responsibilities under Construction Products Enforcement Regulations 2013 by MCHLG or the construction industry in regards to the cladding?
https://www.legislation.gov.uk/id/uksi/2013/1387
You mean the Construction Products Regulations.
The cladding had been tested, the question is whether the tests were appropriate / carried out on the correct product / applied correctly. The supplied test results restricted the use of the cladding to the exact configuration that had been tested and required that further tests be carried out if a different configuration was used.
In February 2018, BRE issued a statement revealing that the original tests they had carried out on the cladding system in 2014 were carried out on a test system that was not constructed according to Celotex’s design specification. See https://www.designingbuildings.co.uk/wiki/ACM_cladding_testing_by_BRE#Original_testing
'This article states that ‘The external envelope of a building should not provide a medium for fire spread if it is likely to be a risk to health and safety. The use of combustible materials in the cladding system and extensive cavities may present such a risk in tall buildings.’ As a result, materials with limited combustibility must be used in buildings with storeys more than 18 m above the ground.'
Does this follow? 12.5 says that combustible materials may present a risk. Then follows specific instructions, with 2 alternative routes to compliance. The Linear Route only specifies that insulation materials and filler materials etc should be of limited combustibility. Why then do you say in effect that the AD B2 requires that all materials be of limited combustibility?
Andrew
The article has been corrected to reflect this comment.
You must sign in or register to edit or comment on an article
Return to Talk:ACM cladding.
Featured articles and news
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
No Falls Week. The importance of safe working at height
What to expect and what is on offer to avoid accidents.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.
From engineered product life-spans, to their extension.
Circular economy in the built environment
A brief description from 2021. Where are we now?
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.