Self-build home: Raise finance
There are several approaches that can be adopted for raising finance:
- Sell an existing property and use any remaining equity after paying back loans. Allowance may need to be made for financing temporary accommodation during the period between sale completion and occupation of the self-build home.
- Raise funds using equity in an existing property as collateral.
- Use capital or liquidate other assets.
- Obtain a mortgage loan. There are a number of companies offering self-build mortgages, typically on the basis of 75% against land value and 60% against building value, releasing funds in the form of stage payments. It is advisable to seek a range of quotes and to pay particular attention to charges for inspection of the work to release progress payments and re-valuations. These charges can vary significantly.
- Apply to schemes such as the Government Custom Build Investment Fund for a loan. This is only available for community schemes with a minimum of five dwellings and a maximum cost of £3m.
NB Self-build homes and the conversion of non-residential buildings into dwellings may qualify to reclaim the VAT paid on eligible building materials and services. See VAT refunds on self-build homes for more information.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Comments