Construction covered by the Party Wall Act of 1996
Contents |
[edit] Introduction
When discussing works that fall within the remit of the Party Wall Act of 1996, it is important to understand and differentiate between works that are ‘notifiable’ and works that are not covered within the Act, also known as “non-notifiable” works.
The term notifiable referrers to works that may be taking place within a homeowner’s property (or building owner under the Party Wall Act 1996). If the proposed works affect any of the neighbouring properties (known as the adjoining owner’s property), then Party Wall procedures will apply.
Notifiable works usually fall within different categories and are notifiable under different Sections of the Act. Notifiable works usually include:
- Excavations taking place near an adjoining owner’s property (such as walls, outhouses or garden structures).
- Works taking place which directly affect a party structure or party wall.
- New walls being built up to - or astride - the line of junction (or boundary line) between two or more properties.
[edit] Excavations
Excavation works taking place within a building owner’s land may still be notifiable, since it may pose a risk to the foundations beneath those structures. This often comes into play with rear extensions or basement conversions.
The sections of the Party Wall Act of 1996 that would apply are:
- 6(1) Excavate to accommodate the foundations to a proposed extension within three metres.
- 6(2) Excavate to accommodate the foundations to a proposed extension within six metres where it cuts at a 45 degree angle measured from the adjoining owner’s footing
[edit] Works directly affecting party wall or structure
Works that directly affect a party structure or party wall have a two month notice period. These types of works most commonly tend occur when undertaking loft conversions, removing chimney breasts or undergoing other structural works to the party wall.
Under the Act, the different types of work covered are set out within the sections below:
- 2(2)(a) To underpin, thicken or raise a party structure, a party fence wall, or an external wall which belongs to the building owner and is built against a party structure or party fence wall.
- 2(2)(b) To make good, repair, or demolish and rebuild, a party structure or party fence wall in a case where such work is necessary on account of defect or want of repair of the structure or wall.
- 2(2)(f) To cut into the party wall for the insertion of steel beams facilitating a proposed loft conversion in the process exposing the party wall.
- 2(2)(g) To cut away the chimney breast(s) attached to the party wall.
- 2(2)(h) To cut away parts of any wall or building of an adjoining owner overhanging onto the land of the building owner.
- 2(2)(j) To cut into the wall of an adjoining owner’s building in order to insert a flashing or other weather-proofing.
- 2(2)(k) To execute any other necessary works incidental to the connection of a party structure.
- 2(2)(l) To demolish party fence wall and rebuild as a party wall.
- 2(2)(n) To expose the party wall.
[edit] New walls
In order to build a new wall up to - or astride - the boundary line, a building owner must get consent beforehand. If the building owner does not get consent, then the new wall must be built within the building owner’s boundary and therefore be built up to the line of junction. These types of works are most commonly the flank walls of new rear, side or front extensions.
The section that would apply to this would be:
- 1(2) Build a new party wall astride the line of junction, forming the flank wall of the proposed extension.
- 1(5) Build a new wall up to the line of junction, but wholly on the building owner’s land forming the flank wall of the proposed extension.
This article was provided by Berrylodge in April 2020.
[edit] Related articles on Designing Buildings
Featured articles and news
Industry survey highlights persistent skills gap
Building engineering business survey by ECA in partnership with BESA, SELECT and SNIPEF.
IHBC Conservation Professional Practice Principles
Spotlighted in HEF Historic Environment Overview.
CIAT collaborates with CIOB, CIfA, Icon to launch The Arc
Helping clients find specialist historic environment professionals.
Government building safety remediation data releases
Show some progress, but a 50% gap not yet started.
Testing For A Safer Future; an initial industry response
A response to the Independent Review of the Construction Product Testing Regime.
Requirements for UK buildings in certain circumstances.
CLC guidance for dutyholders and accountable persons.
Types of contractor in the construction industry
A long list, but are any missing ?
The Housing (Cladding Remediation) (Scotland) Bill 2023
Unanimously approved to legislation on May 14, 2024.
Asset information requirements AIR
In detail, with links to further resources.
Where it's AT Building Safety podcasts from CIAT
Unravelling the Golden Thread and CIAT’s Principal Designer Register for non-HRBs and HRBs.
What happened to Hadrian's Wall?
Its former stones can be found in buildings near its route.
Strategic ventilation in modern building design
Download your free guide.
Four new types of prior approval for solar developments
Online Planning Portal application types from 5 September.