Fire resistance of buildings
Approved Document B Fire Safety, Volume 2, Buildings other than dwellinghouses (2019 edition), defines fire resistance as:
'The ability of a component or a building to satisfy, for a stated period of time, some or all of the appropriate criteria given in the relevant standard.'
Fire resistance is a measure of one or more of the following:
- Resistance to collapse (loadbearing capacity), which applies to loadbearing elements only, denoted R in the European classification of the resistance to fire performance.
- Resistance to fire penetration (integrity), denoted E in the European classification of the resistance to fire performance.
- Resistance to the transfer of excessive heat (insulation), denoted I in the European classification of the resistance to fire performance.
Fire resistance is measured in minutes. This relates to time elapsed in a standard test and should not be confused with real time.
Performance in terms of the fire resistance to be achieved by elements of structure, doors and other forms of construction is classified in accordance with BS EN 13501.
Other information about fire resistance in the approved document includes:
- Table B3 gives the specific requirements for each element of structure.
- Table B4 sets out the minimum periods of fire resistance for elements of structure.
- Table B5 sets out limitations on the use of uninsulated fire resisting glazed elements.
NB PAS 9980:2022, Fire risk appraisal of external wall construction and cladding of existing blocks of flats – Code of practice, published by BSI Standards Limited in 2022, defines fire resistance as the: ‘…ability of an item to fulfil for a stated period of time the required loadbearing capacity and/or integrity and/or thermal insulation, and/or other expected duty specified in a standard fire resistance test. NOTE This is not the time that the item can withstand exposure to any specific real fire without loss of its required performance.’
[edit] Related articles on Designing Buildings
- Adhesives.
- BS 476.
- BS EN 13501-1.
- Cavity barrier.
- Compartment floor.
- Dry riser.
- Escape route.
- Fire.
- Fire and rescue service.
- Fire blanket.
- Fire collar.
- Fire compartment.
- Fire damper.
- Fire detection and alarm systems.
- Fire door.
- Fire safety design.
- Fire-separating element.
- Fire separation.
- Fire-stopping.
- Firefighting route.
- Intumescent coatings.
- Intumescent strip.
- Joint fire code.
- Mastic asphalt flooring.
- Means of escape.
- Passive fire protection is a vital tool in any fire strategy.
- Place of special fire hazard.
- Protected escape route.
- Protected stairway.
- Sacrificial timber.
- Supporting construction.
- Thermoplastic material.
- Unprotected escape route.
- Wet riser.
Featured articles and news
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.
London Build Fire and Security Expo
20-21 Nov and now with new Ambassador Programme..
The Scottish Building Safety Levy
Eight weeks of consultation closing on 18 November.
The grey, the brown and the golden rules of housing
shifting policies from the wild west of housing development.
Future proofing homes that are fit for purpose
Specification challenges and the role of plastic.
Thousands of new homes unlocked for brownfield sites
£68 million to 54 councils for neglected land into new homes.
Comments