[edit] Introduction
Engineering Recommendation G99, or EREC G99, was issued by the Energy Networks Association (ENA) in July 2018 and came into effect on 27 April 2019. It applies to organisations involved in developing generation projects that are connected to the grid. It also affects how different types or configurations of equipment must comply with the requirements.
EREC G99 was published by the ENA to replace EREC G59. After 27 April 2019, organisations were longer legally permitted to connect certain types of power generation equipment that was solely compliant with G59.
[edit] Changes brought about by EREC 99
EREC 99 established more stringent operating parameters for all new generation equipment 1MW (or larger) that would be connected to public distribution networks of licensed Distribution Network Operators (DNOs). It also changed the application process for this type of equipment and put new compliance and commissioning requirements in place.
Under EREC G99, this type of equipment must provide frequency response in either Limited Frequency Sensitive Mode (LFSM) or Frequency Sensitive Mode (FSM) to control active power output in response to frequency changes on the grid.
Generators over 1MW must also include:
- Fault ride through to keep them connected when there are significant voltage depressions due to faults on the grid.
- Fast fault current injection to support the system during a fault by quickly injecting reactive current in order to keep the grid voltage from dropping too low.
- Voltage control systems that can inject or absorb reactive power into the grid to control voltage.
- Enhanced variable reactive power capabilities.
- Testing and protection capabilities previously handled by large grid code compliant power stations.
[edit] Related articles on Designing Buildings
- Microgeneration for buildings
- Power generation
- Power supply.
- Smoothing the path to net zero.
- The future of UK power generation.
[edit] External resources
Featured articles and news
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.
London Build Fire and Security Expo
20-21 Nov and now with new Ambassador Programme..
The Scottish Building Safety Levy
Eight weeks of consultation closing on 18 November.
The grey, the brown and the golden rules of housing
shifting policies from the wild west of housing development.
Future proofing homes that are fit for purpose
Specification challenges and the role of plastic.
Thousands of new homes unlocked for brownfield sites
£68 million to 54 councils for neglected land into new homes.