Egan Report Rethinking Construction
Rethinking Construction - the Egan Report. |
Contents |
[edit] Background
The construction industry in the UK has consistently performed in a way that is thought to be wasteful compared to other industries. There is a general impression that it does not deliver good value for its customers. In part this is due to the unusual nature of the industry, where, unlike a production line, each building is a one off. But in addition, the nature of contracting arrangements means that it can be an adversarial industry with significant potential for disputes.
A succession of reports considered how to tackle these issues, including; ‘Reaching for the Skies’ in 1934, the Simon Report in 1944, the Banwell report in 1967 and the Latham Report 'Constructing the Team' in 1994, in which Sir Michael Latham described the industry as ‘ineffective’, ‘adversarial’, ‘fragmented’ and ‘incapable of delivering for its customers’.
In 1997, the then Deputy Prime Minister John Prescott set up the Construction Task Force, chaired by Sir John Egan, a British industrialist mainly associated the automotive sector, who had been chairman of Jaguar Cars and went on to become Chief Executive of BAA (British Airports Authority).
In 1998, the task force published ‘Rethinking Construction, The report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the scope for improving the quality and efficiency of UK construction’. It is generally referred to as the Egan report.
[edit] Rethinking Construction
In the report, Sir John Egan suggested that ‘the industry as a whole is under-achieving’, and called for ‘dramatic improvements’. He proposed that this would be possible ‘…if we focus all our efforts on delivering the value that our customers need, and if we are prepared to challenge the waste and poor quality arising from our existing structures and working practices’.
Egan stated that ‘…we are not inviting uk construction to look at what it does already and do it better; we are asking the industry and Government to join with major clients to do it entirely differently’.
The report identified five drivers of change:
- Committed leadership.
- A focus on the customer.
- Integrated processes and teams.
- A quality driven agenda.
- Commitment to people.
It proposed:
- Integrated project processes.
- Decent and safe working conditions.
- Improved management and supervisory skills.
- Replacing competitive tendering with long term relationships.
- That leading public sector bodies should become best practice clients.
The report set very ambitious targets of annual reductions of 10% in construction cost and construction time and a reduction in defects of 20% per year.
[edit] Tendering
Within the report, Egan insisted the industry must replace competitive tendering with long-term relationships based on clear measurement of performance and sustained improvement in quality and efficiency:
- An essential ingredient in the delivery of radical performance improvements in other industries has been the creation of long-term relationships or reliance through the supply chain of mutual interest. Alliances allow co-operation and are enable the team to learn and take a stake in improving the product.
- The industry must go to a stage beyond partnering and develop long-term alliances that include all those involved in the process to deliver valuable performance improvements.
- The criteria for the selection of partners is ultimately about best overall value for money, not about lowest price. All players in the team share in success with proper incentive arrangements to enable cost savings.
- There must be an end to the reliance on contracts.
- Bringing discipline to relationships between clients and their suppliers, based on the introduction of performance measurement and competition against clear targets in relation to quality, timelines and cost. Such relationships are much more demanding than those based on competitive tendering.
- Reduced reliance on tendering - the most immediately accessible saving from alliances and partnering comes from a reduced requirement for tendering.
- Competitive tendering promotes cut-throat price competition and inadequate profitability that benefits no-one.
[edit] Impact
The Latham report led to the creation of the Construction Industry Board (CIB) in 1995 to oversee reform. The CIB was replaced by the Strategic Forum for Construction in 2001, chaired by Sir John Egan. In September 2002 the Strategic Forum for Construction published a report on its first year of activity 'Accelerating change: A report by the Strategic Forum for Construction', chaired by Sir John Egan. In it, Egan stated 'I have been greatly impressed by the industry's efforts to apply 'Rethinking Construction' principles'.
In 2002, the Rethinking Construction Group Ltd, chaired by Alan Crane, published Rethinking Construction 2002: Achievements, Next Steps, Getting Involved. The report offered a further update on progress as well as outlining a strategy for the following two years.
A number of other organisations were established following the Egan Report:
- Reading Construction Forum
- Design Build Foundation
- Construction Best Practice Programme
- Movement for Innovation
- Local Government Task Force
- Rethinking Construction
- Be
- Constructing Excellence
- Construction Clients' Group
These organisation united to become Constructing Excellence in 2003.
Since then, there have been significant moves in government procurement to encourage collaborative working and foster partnering, and it is generally considered that construction has become more efficient and safer (ref Constructing Excellence and Glenigan: Industry performance report).
However, the Egan Report was not entirely welcomed by the industry, and there was some perception that applying experience in manufacturing to an industry as different as construction was unrealistic. In May 2008, ten years after publication of Rethinking Construction, Sir John Egan stated: ‘...we have to say we’ve got pretty patchy results. And certainly nowhere near the improvement we could have achieved, or that I expected to achieve…..I guess if I were giving marks out of 10 after 10 years I’d probably only give the industry about four out of 10’ (Ref. Egan: I’d give construction about 4 of 10.)
In 2009, 'Never Waste A Good Crisis' - A Challenge To The UK Construction Industry was written by by Andrew Wolstenholme of Balfour Beatty Management for Constructing Excellence. It was intended to assess the progress that the industry has made since Rethinking Construction and concluded that, ‘Since 1998 we could have had a revolution and what we've achieved so far is a bit of improvement.’
In 2011, the Government Construction Strategy, made a damning assessment of the industry, similar to that of the Egan report, suggesting amongst many criticisms:
- The UK does not get full value from public sector construction.
- There is broad consensus, spread both across the industry and its customers, that construction under-performs.
- Poor and inconsistent procurement practices… leading to waste and inefficiency.
- Low levels of standardisation, and fragmentation of the public sector client base.
Just like the Egan report, the Government Construction Strategy stated an intention to achieve significant savings (15 to 20%).
Given that despite all of these reports, the perception of the industry as wasteful and adversarial remains, and that significant savings continue to be projected if the industry reforms, it might be inferred either that; under the circumstances the industry operates more effectively than it appears from the outside; or that expectations are unrealistic; or that recommendations have been consistently poorly implemented.
It is worth noting that criticism of construction is not peculiar to the UK, and that for example similar assessments have been made in the USA (Ref. Constructing the team: A US Perspective, King 1996).
[edit] Related articles on Designing Buildings
- Accelerating change: A report by the Strategic Forum for Construction.
- Banwell Report.
- Construction 2025.
- Constructing Excellence.
- Construction Industry Board.
- Construction Task Force.
- Demonstration project.
- Emmerson Report.
- Government Construction Strategy.
- Just-in-time manufacturing.
- Latham report.
- Lean construction.
- List of construction industry reports since 1934.
- National Economic Development Office (NEDO) reports.
- Never Waste a Good Crisis.
- Rethinking Construction 2002: Achievements, Next Steps, Getting Involved.
- Strategic Forum for Construction.
- Supply chain management.
[edit] External references
Featured articles and news
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.
London Build Fire and Security Expo
20-21 Nov and now with new Ambassador Programme..
The Scottish Building Safety Levy
Eight weeks of consultation closing on 18 November.
The grey, the brown and the golden rules of housing
shifting policies from the wild west of housing development.
Future proofing homes that are fit for purpose
Specification challenges and the role of plastic.
Thousands of new homes unlocked for brownfield sites
£68 million to 54 councils for neglected land into new homes.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.