Approved Document R
Article 8 of the 2014 Broadband Cost Reduction Directive required that new buildings and major renovations should include the provision of in-building physical infrastructure to support connections to superfast broadband.
In response to this, and following a consultation process carried out in 2015, the government introduced new regulations (SI 2016/490) which introduced requirements for in-building physical infrastructure for high-speed electronic communications networks, and Approved Document R, Physical infrastructure for high-speed electronic communication networks, to provide guidance on these requirements.
Approved documents provide guidance for how the building regulations can be satisfied in common situations.
Approved Document R was published in April 2016 and took effect on 1 January 2017. It applies in England to new buildings and to existing buildings subject to major renovation works.
It introduces a requirement for infrastructure enabling the installation of copper or fibre-optic cables or wireless devices capable of delivering broadband speeds of more than 30 Mbps. In-building infrastructure is required from the service provider’s access point, to the occupier’s network termination point.
The service provider's access point is ‘…the physical point, located inside or outside the building, accessible to undertakings providing or authorised to provide public communications networks, where connection to the high-speed-ready in-building physical infrastructure is made available.’
The network termination point is ‘…a physical point at which an occupier is provided with access to high-speed electronic communications networks’.
The contents of the approved document are:
- The approved documents.
- The Building Regulations.
- Approved Document R, Physical infrastructure for high-speed electronic communication networks.
- Summary
- Section 1: In-building infrastructure.
- Introduction.
- Application.
- Ductwork for copper and fibre optic cables.
- Satellite and wireless communications.
- Further information.
- Appendix A: Key terms.
- Appendix B: Documents referred to.
[edit] Find out more
[edit] Related articles on Designing Building Wiki
- Approved documents.
- Bluetooth.
- Building regulations.
- CAT5.
- Ethernet
- Extranet
- Glossary of electrical terms.
- High-speed electronic communication network.
- ICT and Automation (ICTA) Scoping Study Report.
- In-building wireless.
- Information and communications technology.
- Internet of things.
- Local area network.
- Smart buildings.
- Smart cities.
- Smart technology.
- The future of electricity in domestic buildings.
- WiFi
- WiMax.
- ZigBee.
Featured articles and news
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.
London Build Fire and Security Expo
20-21 Nov and now with new Ambassador Programme..
The Scottish Building Safety Levy
Eight weeks of consultation closing on 18 November.
The grey, the brown and the golden rules of housing
shifting policies from the wild west of housing development.
Future proofing homes that are fit for purpose
Specification challenges and the role of plastic.
Thousands of new homes unlocked for brownfield sites
£68 million to 54 councils for neglected land into new homes.